Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

In the measure settings the visualization of every measure is configured. Clicking on the button on the right side it is possible to jump to Measure settings of to Measure settings of the corresponding measure.

...

The Concept option is used to define one of the visualization concepts. Depending on the specified time type (Past Past, Past, Actual, Future) and the scenario (actual, budget, forecast) in the base the base data rule settings of the data context for the current measure and depending on the Notation setting (see above), the following defined base concept settings are used for:

...

Depending on the specified time type (Past Past, Past, Actual, Future) and the scenario (actual, budget, forecast) in the reference the reference data rule settings of the data context for the current measure and depending on the Notation setting (see above), the following defined reference concept is additionally used to the given base conception for:

...